Construction Not Yet Started at 1640-48 North Hancock Street in Kensington

Rendering of 1640-48 North Hancock Street. Credit: HDO Architecture.Rendering of 1640-48 North Hancock Street. Credit: HDO Architecture.

A recent site visit has revealed that construction has still not started at a six-story, 110-unit mixed-use development at 1640-48 North Hancock Street in Olde Kensington, although the site has been cleared and appears ready for excavation. Designed by HDO Architecture, the building will feature commercial space on the ground floor and a garage. The structure will hold 119,155 square feet of floor space. Construction costs are specified at $10.5 million.

1640-48 North Hancock Street. Photo by Jamie Meller. December 2022

1640-48 North Hancock Street. Photo by Jamie Meller. December 2022

1640-48 North Hancock Street. Photo by Jamie Meller. December 2022

1640-48 North Hancock Street. Photo by Jamie Meller. December 2022

1640-48 North Hancock Street. Photo by Jamie Meller. December 2022

1640-48 North Hancock Street. Photo by Jamie Meller. December 2022

1640-48 North Hancock Street. Photo by Jamie Meller. December 2022

1640-48 North Hancock Street. Photo by Jamie Meller. December 2022

The development is bound by North Hancock Street to the east, Cecil B. Moore Avenue to the north, and Palethorp Street to the west.

Rendering of 1640-48 North Hancock Street. Credit: HDO Architecture.

Rendering of 1640-48 North Hancock Street. Credit: HDO Architecture.

Rendering of 1640-48 North Hancock Street. Credit: HDO Architecture.

Rendering of 1640-48 North Hancock Street. Credit: HDO Architecture.

Rendering of 1640-48 North Hancock Street. Credit: HDO Architecture.

Rendering of 1640-48 North Hancock Street. Credit: HDO Architecture.

Subscribe to YIMBY’s daily e-mail

Follow YIMBYgram for real-time photo updates
Like YIMBY on Facebook
Follow YIMBY’s Twitter for the latest in YIMBYnews

.

3 Comments on "Construction Not Yet Started at 1640-48 North Hancock Street in Kensington"

  1. In today’s Inky or online news, there was a story about horse carriages being removed from their warehouse and there was no word about the fate of the horse carriages held in this warehouse which would be demoed to start the above mentioned project.

    Is this the reason for construction delays?

  2. There is a horse carriage in a picture of the warehouse. Is this the place where horse carriages are kept till their gate can be determined by the Only?

  3. Till their fate can be determined by the Inky?

Leave a comment

Your email address will not be published.


*