Progress Appears Imminent on Broad + Pine at 337 South Broad Street in Washington Square West, Center City

Broad + Pine at 337 South Broad Street. Credit: Dranoff PropertiesBroad + Pine at 337 South Broad Street. Credit: Dranoff Properties

Demolition preparations are underway for Broad + Pine, a 361-foot-tall tower proposed at 337 South Broad Street in Washington Square West, Center City, and number 16 on Philly YIMBY’s December 2020 Development Countdown. Designed by Cecil Baker + Partners Architects and developed by Dranoff Properties, the tower will stand 28 stories and yield 56 condominium units. The site, which is located at the northeast corner of Broad Street and Pine Street, is currently occupied by a three-story prewar building that once housed retail and a parking garage.

Our recent site visit reveals that the building is now vacant, with demolition prep work possibly in progress in the interior.

Broad + Pine from South Broad Street. Photo by Thomas Koloski

Broad + Pine from South Broad Street. Photo by Thomas Koloski

Broad + Pine from the corner of South Broad Street and Pine Street. Photo by Thomas Koloski

Broad + Pine from the corner of South Broad Street and Pine Street. Photo by Thomas Koloski

Broad + Pine (bottom right). Photo by Thomas Koloski

Broad + Pine (bottom right). Photo by Thomas Koloski

The project was first proposed in 2015, two years after Dranoff unveiled Arthaus, which is now reaching its pinnacle a block to the north. The structure was initially to stand 22 stories tall, but the redesign gave the tower a height boost. The city approved the building for construction in September 2017, one month after the Civic Design review document was posted to the city website. Construction permits have been submitted to the city, but no visible progress has occurred other than its tenants vacating. However, on our site visit we noted that the garage door was wide open on Broad Street with a truck inside, possibly stationed for demolition preparation.

The tower will become a significant part of a new cluster of high-rise buildings, which first began when the 375-foot-tall, 31-story Symphony House opened catty-corner to the site in 2007.

No construction timeline or completion date has been announced.

Subscribe to YIMBY’s daily e-mail

Follow YIMBYgram for real-time photo updates
Like YIMBY on Facebook
Follow YIMBY’s Twitter for the latest in YIMBYnews

.

2 Comments on "Progress Appears Imminent on Broad + Pine at 337 South Broad Street in Washington Square West, Center City"

  1. An excellent development that will add some density to the Kimmel Center area!!

    Very good design.

    This is exactly what we need.

  2. Herb Moskovitz | April 3, 2022 at 3:03 am | Reply

    I am glad that the old garage is finally going to be demolished. About ten or fifteen years ago a piece of masonry fell off and killed a man on the sidewalk.

Leave a Reply to Brian Cancel reply

Your email address will not be published.


*