Permits have been issued for the construction of a three-story residential building at 925 North 47th Street in Mill Creek, West Philadelphia. The building will be constructed on a vacant lot spanning 1,600 square feet, situated on mid-block bound by Wyalusing Avenue, Westminster Avenue, and North May Street, facing North 47th Street. The project has an allocated total construction cost of $674,800, with $614,800 as the general construction cost.
Records show NNN OASI LLC listed as the property owner. MC Architectural is responsible for the designs.
The scope of work includes the construction of a three-story attached structure to be used as a multi-family residence. The three-story will offer four residential units and yield a total built-up area spanning 4,557 square feet. The unit size will vary between 1,060 square feet to 1,200 square feet. The residential building will rise to a height of 33 feet. A rear yard spanning an area of 400 square feet will also be developed. The residence will also feature an attached structure with roof deck accessed from the third floor.
Separate permits are required for the commercial space, mechanical, electrical, plumbing, and fire suppression work. The site is located near various industrial stops, grocery stores, shops, and restaurants. No estimated construction timeline has been announced yet.
Subscribe to YIMBY’s daily e-mail
Follow YIMBYgram for real-time photo updates
Like YIMBY on Facebook
Follow YIMBY’s Twitter for the latest in YIMBYnews
A permit for commercial space is not required because there is no commercial space.