Recently issued permits outline plans for a new two-story single-family home proposed at 35 East Seymour Street in the Germantown section of Northwest Philadelphia. The semi-detached structure will rise on a currently vacant parcel. Records identify the Philadelphia Land Bank as the property owner, with Moto Designshop responsible for the designs and Spruce Builders listed as the contractor.
Permit records list a total construction cost at $125,300.

35 East Seymour Street Existing Plan via Moto Design Shop Inc
The proposed building, situated within the RSA-5 residential zoning district, will be classified for R-3 residential occupancy. The project will span a total of 1,300 square feet, with no parking provided. A side yard will separate the building from an adjacent structure. A Streets Department review has been completed and issued, reflecting work within the public right-of-way associated with the proposed site access.

35 East Seymour Street Proposed Plan via Moto Design Shop Inc
Architectural drawings depict a brick-clad front facade set directly at the property line, consistent with a classic rowhouse style. The elevation shows vertically aligned window openings across both floors, with paired windows on the primary wall plane. A recessed ground-floor entry will be positioned along one side of the facade , which will be accessed by exterior steps from the sidewalk. Subtle architectural detailing is provided through shallow pilaster-style embellishments with minimal projection, along with a modest cornice line that will cap the facade and screen the roofline behind.
No construction timeline has been announced.
Subscribe to YIMBY’s daily e-mail
Follow YIMBYgram for real-time photo updates
Like YIMBY on Facebook
Follow YIMBY’s Twitter for the latest in YIMBYnews






35 East Seymour Street and 4925 Wakefield Street (see next post) are nearly identical but mirror images of each other. It is cost effective to build two structures using the same architectural plans, materiel, and construction firm.
Although unavoidable, two large mature trees will be lost.
Hopefully, they will plant a tree in front of both houses.