Mixed use

One Cathedral Square at 1701 Race Street. Credit: Solomon Cordwell Buenz

One Cathedral Square Nearly Topped Out in Logan Square, Center City

The concrete structure is nearly topped out at One Cathedral Square, a 244-foot-tall, 23-story residential rising at 1701 Race Street in Logan Square, Center City, a block south of from the Vine Street Expressway. Designed by Solomon Cordwell Buenz and developed by the Archdiocese of Philadelphia and the Exeter Property Group, with the Hunter Roberts Construction Group as the contractor, the building is part of Cathedral Square, a block-spanning development that will also include the 470-foot-tall Two Cathedral Square tower.

Read More



Rendering of 1324-38 Frankford Avenue

Permits Issued for 20-Unit Building at 1324-38 Frankford Avenue in Fishtown, Kensington

Permits have been issued for the construction of a 20-unit mixed-use condominium building at 1324-38 Frankford Avenue in Fishtown, Kensington. The new building will rise four stories tall and will feature commercial space at the ground floor. A roof deck and a green roof will be situated at the top. The structure will span a total of 21,472 square feet of space.

Read More

1810 Chestnut Street. Credit: Cecil Baker + Partnenrs

Freeman Auction House Set for High-Rise Vertical Extension at 1810 Chestnut Street in Rittenhouse Square, Center City

The 23rd place on Philly YIMBY’s December 2021 Development Countdown goes to the 25-story, 312-foot-tall residential high-rise proposed at 1810 Chestnut Street in Rittenhouse Square, Center City. Designed by Cecil Baker + Partners, the project consists of a 19-story vertical addition atop the existing six-story Samuel T. Freeman & Co. Auction House, built in 1923. The vertical addition will house 19 apartments, many of which will be full-floor and duplex units. The renovated historic building will hold several stories of retail, tenant amenities, and automated underground parking for around ten cars. Though our recent site visit revealed no signs of ongoing work, it may begin at any time as a partial demolition and construction permit was issued in November 2020.

Read More

Fetching more...